Insulation:
This
is a very important feature. Our insulation process starts at the foundation
where Styrofoam perimeter insulation is installed under the concrete slab
to insure that cold air does not penetrate from under the slab. During
wall construction, insulation is installed between the bottom plates of
the exterior walls and the slab. Before the wall insulation is installed
each hole from the attic is carefully sealed. The windows and doors are
also insulated where the frames meet the walls. Then the insulation is
blown into the wall cavity around each pipe and wire. This system totally
fills the space between each stud giving a R-15 value. Before the brick
is applied to the exterior each window and seam in the wall sheeting is
sealed. The attic space is insulated with a R-30 blown in insulation.Roof
wind turbines are installed to ventilate the attic space.